Below are typical and proven configurations for a standard CCI installation.
4.1 Flow: PV → Consumption / Accumulation
| Device | Order | Justification |
| Heating pump | 1 | Direct consumption, high contribution |
| EV charger | 2 | Flexible consumption |
| BESS (charging) | 3 | Storage only after consumption |
| GRID (export) | - | Only residual energy |
4.2 Flow: Production / BESS → GRID (reserved power)
Equipment | Attenuation order | Justification |
| BESS (discharge) | 1 | Fastest regulation |
PV | 2 | Restriction only after BESS |
| Scenario: drop in consumption → first, BESS discharge is reduced, then PV power. | ||
4.3 Flow: GRID → Consumption / Accumulation (reserved power input, protection)
Equipment | Order | Justification |
EV charger | 1 | Most flexible consumption |
| Heating pump | 2 | Can be limited in the short term |
| BESS (charging) | 3 | Can be limited during overload |
Other technologies 4-6 According to criticality | ||
4.4 Summary of recommended priorities
Energy flow | Priority 1 | Priority 2 | Priority 3 |
| PV → consumption | Heating pump | EV charger | |
| BESS Export to GRID | BESS | ||
PV | |||
| GRID → consumption | EV charger | Heating pump | BESS |
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article